METHOD FOR CONSTRUCTING CONTINUOUS UNDERGROUND WALL AND STEEL PIPE PILE

机译:连续地下墙和钢管桩的施工方法

摘要

A method for constructing a continuous underground wall includes: a steel pipe installation step of continuously alternately installing first steel pipes and second steel pipes in a construction direction; an excavation step of excavating a content in each of the first steel pipes and the second steel pipes; a first solidification material-filling step of pulling out the first steel pipe while the first steel pipe is being filled with concrete and after the first steel pipe has been filled with concrete; and a second solidification material-filling step of pulling out the second steel pipe while first piles are being disturbed using claws protruding to the outside of the second steel pipe while the second steel pipe is being filled with concrete or after the second steel pipe has been filled with concrete. Both sides of a second pile are joined to the first piles using replenishing concrete while the first pile is being disturbed using the claws.
机译:一种连续地下墙的建造方法,包括:在施工方向上连续交替地交替安装第一钢管和第二钢管的钢管安装步骤;开挖步骤,对第一钢管和第二钢管中的每一个中的内容物进行挖掘;第一固化材料填充步骤,在第一钢管填充混凝土的同时以及在第一钢管填充混凝土之后,抽出第一钢管。第二固化材料填充步骤是在第二钢管填充混凝土时或在第二钢管已经被填充之后,使用突出到第二钢管外部的爪将第一钢管搅动时拔出第二钢管。充满混凝土。第二个桩的两侧使用补给混凝土连接到第一个桩,而第一个桩则被爪子打扰。

著录项

  • 公开/公告号WO2019017498A1

    专利类型

  • 公开/公告日2019-01-24

    原文格式PDF

  • 申请/专利权人 GIKEN LTD.;

    申请/专利号WO2018JP27786

  • 发明设计人 KITAMURA AKIO;

    申请日2018-07-18

  • 分类号E02D5/28;E02D5/68;E02D19/18;

  • 国家 WO

  • 入库时间 2022-08-21 11:57:12

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号