Pile Load Tests of Large Diameter Battered Steel Pipe Piles Constructed in an Offshore Area

机译:海洋地区大直径钢管桩的桩载荷试验

获取原文
获取原文并翻译 | 示例

摘要

Battered piles were driven for the foundation of Gwang-An grand bridge in Pusan, Korea. The bridge foundation consists of 8 to 12 piles and each one is composed of two materials. The outer part of the pile consists of a 28 mm thick with a diameter of 2500mm while the inner part is filled with concrete. The construction of pile is performed through three steps. First, the steel pipe is driven using the hydraulic vibrating hammer on the jack-up barge. The next step is digging out the soil and rock about 6 meters deeper than the toe of the steel pipe using RCD equipment. The final step is pouring concrete through the tremie pipe. Each pile is designed to bear 1500 ton and the pile end is to be located on the soft rock. The end of 3 piles are, however, located on the weathered rock because of the workability of the RCD equipment. In order to verify the allowable bearing capacity of these piles, several pile load tests were carried out.
机译:在韩国釜山,广安大桥被打碎。桥梁基础由8到12个桩组成,每个桩由两种材料组成。桩的外部部分由28毫米厚,直径2500毫米组成,而内部则填充有混凝土。桩的施工通过三个步骤进行。首先,使用自升式驳船上的液压振动锤来驱动钢管。下一步是使用RCD设备挖掘比钢管脚尖深6米的土壤和岩石。最后一步是通过特雷米管浇筑混凝土。每个桩的设计承载力为1500吨,桩端应位于软岩上。但是,由于RCD设备的可操作性,三桩桩的末端位于风化的岩石上。为了验证这些桩的容许承载力,进行了几次桩载荷测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号