首页> 外国专利> Construction method of small-calibre sewer pipe using steel pipe working hole and precast concrete slab into flimsy ground

Construction method of small-calibre sewer pipe using steel pipe working hole and precast concrete slab into flimsy ground

机译:利用钢管工作孔和预制混凝土板到脆弱地面的小口径下水道施工方法

摘要

The present invention relates to a method to reinforce a soft ground for a small diameter sewer pipe using a steel pipe working hole and a precast bottom plate, capable of largely reducing a construct period. According to the present invention, the method to reinforce a soft ground for a small diameter sewer pipe using a steel pipe working hole and a precast bottom plate comprises: a step (a) of inserting a steel pipe; a step (b) of excavating the inside of the steel pipe to form a working hole; a step (c) of discharging infiltrating water in the working hole to the outside; a step (d) of installing an entrance; a step (e) of penetrating a plurality of lead pipes into the entrance to propel the lead pipes toward a manhole; a step (f) of sequentially disassembling the lead pipes coming out of the manhole; a step (g) of sequentially disassembling an auger; a step (h) of disassembling a front end pipe; a step (i) of removing a propeller; a step (j) of installing aggregates on the bottom of the working hole; and a step (k) of installing a connection pipe to a main pipe of a working hole side and installing a manhole in the working hole.
机译:本发明涉及一种使用钢管工作孔和预制底板来加固小直径下水道管道的软土地基的方法,该方法能够大大减少施工时间。根据本发明,使用钢管工作孔和预制底板来加固小直径下水道管道的软土地基的方法包括:(a)插入钢管的步骤;步骤(b),对钢管的内部进行开挖以形成工作孔。步骤(c)将工作孔中的渗透水排到外面; (d)设置入口的步骤;步骤(e),将多根导线管穿入入口,以将导线管推向人孔。步骤(f),依次拆卸从人孔出来的导管。步骤(g),依次拆卸螺旋钻; (h)拆卸前端管的步骤;步骤(i),拆卸螺旋桨;步骤(j),在工作孔的底部安装骨料;步骤(k),将连接管安装到工作孔侧的主管上,并在工作孔中安装检修孔。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号