首页> 外国专利> Apparatus of Installing Pillar for Mulriplex arch tunnel and Installing Method thereof

Apparatus of Installing Pillar for Mulriplex arch tunnel and Installing Method thereof

机译:多拱拱隧道安装柱的装置及其安装方法

摘要

The present invention relates to an apparatus for installing a filler for an arch tunnel and an installation method using the same, the apparatus for installing a filler installed to support a ground load at a center, which is superimposed on a multiple arch tunnel constructed to overlap a plurality of tunnels, A filler pillar body disposed at a predetermined distance in the form of a column on an upper portion of the base pillar body; and a filler pillar body disposed at a predetermined distance in the form of a column on an upper portion of the base pillar body, A pillar portion supporting the ground of the tunnel at a position where the upper pillar body is assembled by assembling the upper pillar body installed to support the load while being in contact with the upper surface of the tunnel, Wherein the filler pillar body and the upper filler body are rolled and conveyed along the base filler body by power applied by being supported on both sides and both sides of the upper portion of the base filler body, A bogie portion; An inner pipe disposed at an upper portion of the transporting bogie and adapted to be transported to a position mutually fixed with the base filler body by operation of the feed bogie with the filler column body being laid; And a position adjusting unit disposed on the upper portion of the cradle unit and configured to move up and down and left and right in a state in which the upper filler body is transported by the operation of the transporting cradle together with the cradle unit. A pillar mounting device and a mounting method using the same.
机译:拱形隧道填充物的安装装置及安装方法技术领域本发明涉及拱形隧道的填充物的安装装置及使用该装置的安装方法,该填充物的安装装置被设置成在中心重叠地支承在重叠的多层拱形隧道上。多个隧道,在基柱主体的上部以规定的距离呈圆柱状配置的填料柱主体。并且,在基柱体的上部,以规定的距离呈柱状配置的填充柱体,在通过组装上柱而组装上柱体的位置,支撑隧道的地面的柱部。被安装成在与隧道的上表面接触时支撑载荷的主体,其中,填充支柱主体和上部填充主体通过被支撑在隧道的两侧和两侧上而施加的动力沿底部填充主体滚动并输送。底座填充物主体的上部是转向架部分。内管设置在输送转向架的上部,并且适于在放置有填料塔体的情况下通过进给转向架的操作而被输送到与基础填料主体相互固定的位置。位置调节单元设置在托架单元的上部,并且构造成在通过输送托架的操作与托架单元一起输送上填充物主体的状态下上下左右移动。立柱安装装置及其使用方法。

著录项

  • 公开/公告号KR101932118B1

    专利类型

  • 公开/公告日2018-12-24

    原文格式PDF

  • 申请/专利权人 주식회사 신성이엔씨;

    申请/专利号KR20160072248

  • 发明设计人 윤석오;

    申请日2016-06-10

  • 分类号E21D9/01;E04G25/02;E21D13;E21D15/02;

  • 国家 KR

  • 入库时间 2022-08-21 11:51:57

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号