首页> 外国专利> Controller, and more particularly, to a method for transferring control control variables from a wind farm controller to a unit in a wind farm,

Controller, and more particularly, to a method for transferring control control variables from a wind farm controller to a unit in a wind farm,

机译:控制器,更具体地说,涉及一种用于将控制控制变量从风电场控制器传输到风电场中的单元的方法,

摘要

The present invention relates to a unit 100 of a wind power generator complex 112 from a wind power generator complex controller 10 of a wind power generator complex 112, in particular at least one wind power generator 100 and / To a control adjustment variable (78), comprising the steps of: Determining (58) a first control adjustment variable portion (26); Determining (66) a second control adjustment variable part (44) by the wind farm controller (10); Outputting (60) a first control adjustment variable portion (26) to a first data packet (64); Outputting (68) a second control adjustment variable portion (44) to a second data packet (70); Receiving (62) by the first unit (100) a first data packet (64) having a first control adjustment variable part (26); Receiving (72) by the first unit (100) a second data packet (70) having a second control adjustment variable part (44); And forming (76) a control adjustment variable (78) from the first control adjustment variable portion (26) and the second control adjustment variable portion (44) in the first unit (100) 64 includes a receiver address assigned to the first unit and at least one additional unit and a second data packet 70 includes a receiver address assigned to at least the first unit 100. [ The present invention also relates to a wind power generator controller 10, a wind power generator 100, and a wind power generator 112 for performing the above method.
机译:本发明涉及一种风力发电机组112的单元100,其来自风力发电机组112的风力发电机组控制器10,尤其是至少一个风力发电机100和/或控制调节变量(78)。包括以下步骤:确定(58)第一控制调整变量部分(26);由风电场控制器(10)确定(66)第二控制调整变量部分(44);将第一控制调整变量部分(26)输出(60)到第一数据包(64);将第二控制调整变量部分(44)输出(68)到第二数据包(70);第一单元(100)接收(62)具有第一控制调整变量部分(26)的第一数据分组(64);由第一单元(100)接收(72)具有第二控制调整变量部分(44)的第二数据分组(70);并且在第一单元(100)64中从第一控制调节变量部分(26)和第二控制调节变量部分(44)形成控制调节变量(78)包括分配给第一单元的接收器地址,以及至少一个附加单元和第二数据分组70包括分配给至少第一单元100的接收器地址。[本发明还涉及风力发电机控制器10,风力发电机100和风力发电机112用于执行上述方法。

著录项

  • 公开/公告号KR20190052034A

    专利类型

  • 公开/公告日2019-05-15

    原文格式PDF

  • 申请/专利权人 보벤 프로퍼티즈 게엠베하;

    申请/专利号KR20197009721

  • 发明设计人 지르츠 헬게;

    申请日2017-08-29

  • 分类号G05B19/418;F03D7/04;G05B19/10;

  • 国家 KR

  • 入库时间 2022-08-21 11:50:57

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号