首页> 外国专利> 2 - SYSTEM AND METHOD FOR CONTROLLING AT LEAST TWO AUTOMATED NON-PASSING RAIL MOUNTED GANTRY CRANES

2 - SYSTEM AND METHOD FOR CONTROLLING AT LEAST TWO AUTOMATED NON-PASSING RAIL MOUNTED GANTRY CRANES

机译:2-用于控制至少两个自动非通过式轨道式龙门起重机的系统和方法

摘要

Systems and methods are described for controlling at least two automated non-passing rail mounted gantry cranes 3a, 3b, 3c. The system includes, for each crane, crane control units 2a, 2b, 2c to ensure the execution of at least one work order 10a, 10b, 10c received by each crane from the external scheduling system 9. do. In order to improve crane efficiency, the system further comprises a rescheduling unit for rescheduling at least one work order based on the expected trajectories along the rails 4a, 4b determined for each work order. Rescheduling reduces the number or duration of situations by dividing at least one of the work orders into at least two new work orders, and where the expected trajectory of one crane blocks the expected trajectory of another crane, and / or This is accomplished by resequencing and reallocating the resulting work order to reduce workload imbalance between cranes. The rescheduling unit is operated in parallel with the crane control units 2a, 2b, 2c, ie during the execution of the original work order, and dynamically updates these original work orders.
机译:描述了用于控制至少两个自动非通过轨道安装的龙门起重机3a,3b,3c的系统和方法。对于每个起重机,该系统包括起重机控制单元2a,2b,2c,以确保执行每个起重机从外部调度系统9.do接收的至少一个工作指令10a,10b,10c。为了提高起重机的效率,该系统还包括重新安排单元,该重新安排单元用于基于沿着针对每个工作顺序确定的轨道4a,4b的预期轨迹来重新安排至少一个工作顺序。通过将至少一个工单划分为至少两个新工单,并且在一台起重机的预期轨迹阻止另一台起重机的预期轨迹的情况下,重新安排可以减少情况的数量或持续时间,并且/或者这可以通过重新排序和重新分配最终的工作订单,以减少起重机之间的工作量失衡。重新调度单元与起重机控制单元2a,2b,2c并行操作,即在执行原始工单期间,并动态更新这些原始工单。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号