首页>
外国专利>
SETTLING TANK AND METHOD FOR GUIDING PARTIAL FLOWS IN THE INLET AREA OF SETTLING TANKS
SETTLING TANK AND METHOD FOR GUIDING PARTIAL FLOWS IN THE INLET AREA OF SETTLING TANKS
展开▼
机译:沉淀池和用于引导沉淀池入口区域中的局部流动的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
In sedimentation basins (1) there are inlet structures (2), through whose height-adjustable inlet opening (3) the suspension flows to the basin. Depending on the current load, the volume flow flowing out of the inlet structure can be directed in addition to the height variability of the inlet opening by forming a horizontally flowed inlet opening (3a) or a vertically flowed inlet opening (3b) and optionally in horizontal and vertical partial flows Q sub I Split /sub and Q sub II /sub. As a result of the horizontal inflow, the capacity of the sedimentation basin increases when the load is high; due to the vertical inflow, the volume flow through the sedimentation space and the turbulent energy in the sedimentation space decrease at low load, so that the retention of fine suspensa in the sedimentation basin increases and thus the drainage quality is improved ,
展开▼
机译:在沉淀池(1)中有进口结构(2),悬浮液通过其高度可调的进口(3)流入到沉淀池中。根据当前负载,通过形成水平流动的进气口(3a)或垂直流动的进气口(3b)以及可选地在进气口中形成一个水平流动的进气口(3a),除了入口进气口的高度可变性之外,还可以引导从进气口结构流出的体积流。水平和垂直分流Q I Split sub>和Q II sub>。由于水平流入,高负荷时沉淀池的容量增加。由于垂直流入,在低负荷下流经沉淀空间的体积流量和沉淀空间中的湍流能量减少,从而使细悬浊液在沉淀池中的保留量增加,从而改善了排水质量,
展开▼