首页> 外国专利> Stair structure, stair structure construction method, main member of stair structure and intermediate member of stair structure

Stair structure, stair structure construction method, main member of stair structure and intermediate member of stair structure

机译:楼梯结构,楼梯结构的施工方法,楼梯结构的主体和楼梯结构的中间构件

摘要

PROBLEM TO BE SOLVED: To make an overall width of a staircase structure variable.SOLUTION: In a contracted state, a stair landing 400c in a contracted state is formed by connecting a stair landing member 202c of a main member 200c with a stair landing member 203d of a main member 200d without interposing an intermediate member 300c between the stair landing member 202c and the stair landing member 203d. As such, a width of the stair landing 400c in the contracted state is made narrower than a width in an enlarged state. A stair member 201c ascending toward the stair landing 400c is integrated with the stair landing member 202c and a stair member 201d descending toward the stair landing 400c is integrated with the stair landing member 203d. As such, a width between the stair member 201c and the stair member 201d in the contracted state is made narrower than a width in the enlarged state by connecting the stair landing member 202c and the stair landing member 203d to each other without interposing the intermediate member 300c. As a result, an overall width of a staircase structure 100 is made variable.SELECTED DRAWING: Figure 2
机译:解决的问题:使楼梯结构的整体宽度可变。解决方案:在收缩状态下,通过将主构件200c的楼梯平台构件202c与楼梯平台构件连接而形成处于收缩状态的楼梯平台400c。主体构件203d的主体203d中没有将中间构件300c插入楼梯平台构件202c和楼梯平台构件203d之间。这样,使处于收缩状态的楼梯平台400c的宽度比处于放大状态的楼梯平台400c的宽度窄。朝向楼梯平台400c上升的楼梯构件201c与楼梯平台构件202c成一体,并且朝楼梯平台400c下降的楼梯构件201d与楼梯平台构件203d成一体。这样,在不插入中间构件的情况下,通过将楼梯平台构件202c和楼梯平台构件203d彼此连接,使得处于收缩状态的楼梯构件201c和楼梯构件201d之间的宽度比在放大状态下的宽度窄。 300c。结果,使楼梯结构100的总宽度可变。选图:图2

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号