首页>
外国专利>
METHOD FOR OPERATING A WIND TURBINE, CONTROLLER STRUCTURE, WIND TURBINE AND WIND FARM
METHOD FOR OPERATING A WIND TURBINE, CONTROLLER STRUCTURE, WIND TURBINE AND WIND FARM
展开▼
机译:风力涡轮机的运行方法,控制器结构,风力涡轮机和风力发电场
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a method (600) for operating a wind turbine (100), the wind turbine (100) having a tower (102) with external tower loads acting thereon, and an aerodynamic rotor (106) having rotor blades (108) the pitch angle of which is adjustable, which rotor generates a rotor thrust, the method (600) comprising the following steps: determining (610) a speed of a tower head (vTK) of the tower and/or of a nacelle of the wind turbine (100); determining (620) an absolute wind speed (vw) in the area of the wind turbine (100); determining (630) a pure wind power (Pwind) on the rotor on the basis of the absolute wind speed (vw); determining (640) an apparent wind power (Papparent) on the rotor on the basis of the speed of the tower head and/or of the nacelle; determining (650) an aerodynamic tower vibration power (PAT) on the basis of a difference between the apparent wind power (Papparent) and the pure wind power (Pwind); and controlling (660) the wind turbine using the aerodynamic tower vibration power (PAT).
展开▼
机译:本发明涉及一种用于操作风力涡轮机(100)的方法(600),该风力涡轮机(100)具有在其上作用有外部塔架载荷的塔架(102),以及具有转子叶片(108)的空气动力学转子(106)。 )其俯仰角是可调的,哪个转子产生转子推力,方法(600)包括以下步骤:确定(610)塔顶速度( v I> TK I> Sub>)和/或风力涡轮机(100)的机舱;确定(620)风力涡轮机(100)的区域中的绝对风速( v I> w I> Sub>);根据绝对风速( v <)确定(630)转子上的纯风力( P I> wind I> Sub>) / I> w I> Sub>);根据塔顶的速度和/或风速,确定(640)转子上的视在风力( P I> I> Sub>)机舱根据视在风力(P )之间的差异确定(650)空气动力学塔架振动功率( P I> AT I> Sub>)表观 Sub>)和纯风力( P I> 风 I> Sub>);并使用空气动力学塔架振动功率( P I> AT I> Sub>)控制(660)风力涡轮机。
展开▼