On-site manufacturing underground indentation method and underground structure formation method

机译:现场制造地下压痕法及地下构造物的形成方法

摘要

It relates to a field-produced underground press-fit method and an underground structure forming method using the same, After transporting a number of steel plates cut in a predetermined width and length according to the site conditions to the site, the underground press assembly was manufactured so that horizontal blades were integrally formed on both sides of the rectangular work area and the rectangular work area directly at the site. By adopting a method of forming an underground structure in a special way in the underground using this, Since it is to cut a number of steel plates in a predetermined width and length according to the site conditions and transport them to the site, the volume can be minimized and a large amount can be transported at once, so transport is easy and transport costs can be drastically reduced. After transporting to the site, the underground press unit is manufactured so that the horizontal blades are integrally formed at the upper and lower sides of the rectangular work area and the rectangular work area directly in a large space of the site, so the production of the underground press unit is very easy and the manufacturing time is dramatically reduced. Of course, The vertical gap width of the underground press unit can be accurately manufactured as the thickness of the slab formation, so when the manufactured underground press unit is pressed into the ground, the slab forming space is naturally formed. Slabs can be formed with a simpler, quicker and more accurate thickness than using the method of securing the slab formation space by using the underground press fittings, reducing the number of underground press fittings, and forming a structurally strong underground structure. Material can be drastically reduced and at the same time there is no waste of materials. The waterproofing is accomplished perfectly by welding the ends of the upper horizontal blades of the post-propelled underground press unit to each other or by welding the ends of the upper horizontal blades of the post-propelled sub-ground press unit to the square tube. Therefore, the present invention is not only impossible because there are obstacles that cannot be transferred, such as buildings, roads, and railroads, and it is particularly a low-topic section, so even when the existing construction method cannot install the underground structure in a predetermined form, It is safe, structurally safe, and has the characteristics of quickly and safely constructing a perfect underground structure even waterproof.
机译:本发明涉及现场生产的地下压入配合方法和使用该方法的地下结构形成方法,将根据现场条件切割成预定宽度和长度的多个钢板运输到现场后,地下压入组件被组装成地面。如此制造,使得水平刀片在矩形工作区域和矩形工作区域的两侧直接整体形成在现场。通过采用这样的在地下特殊方式形成地下结构的方法,由于要根据现场条件以预定的宽度和长度切割多个钢板并将其运送到现场,因此体积可以最小化并且可以一次大量运输,因此运输容易并且可以大大降低运输成本。在运输到现场之后,制造地下压力机单元,使得水平刀片直接在现场的较大空间中在矩形工作区域和矩形工作区域的上侧和下侧一体地形成,因此生产地下压力机非常容易,制造时间大大减少。当然,地下压制单元的竖直间隙宽度可以精确地制造为板坯的厚度,因此当将制造的地下压制单元压入地下时,自然形成了板坯形成空间。与通过使用地下压力机配件,减少地下压力机配件的数量以及形成结构坚固的地下结构的方法来确保板坯形成空间的方法相比,可以以更简单,更快和更准确的厚度来形成板坯。可以大大减少材料,同时也不会浪费材料。通过将后推式地下压力机的上部水平叶片的端部彼此焊接在一起,或通过将后推式地下压力机的上部水平叶片的端部焊接到方管上,可以完美地实现防水。因此,本发明不仅是不可能的,因为存在诸如建筑物,道路和铁路之类的无法传递的障碍物,并且本发明尤其是低主题区域,因此即使当现有的施工方法不能在地下建筑中安装地下结构时,本发明也是不可能的。既定的形式,它是安全的,结构上安全的,并且具有快速安全地构造甚至防水的理想地下结构的特征。

著录项

  • 公开/公告号KR102153702B1

    专利类型

  • 公开/公告日2020-09-08

    原文格式PDF

  • 申请/专利权人 INSCO ENGINEERING;

    申请/专利号KR20200007093

  • 发明设计人 김경곤;김현곤;박영우;김정윤;

    申请日2020-01-20

  • 分类号E21D9;E21D11/38;

  • 国家 KR

  • 入库时间 2022-08-21 11:03:47

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号