首页> 美国政府科技报告 >Vehicle Crash Tests of the Type 80 Bridge Rail
【24h】

Vehicle Crash Tests of the Type 80 Bridge Rail

机译:80型桥梁轨道车辆碰撞试验

获取原文

摘要

An aesthetic, see-through concrete bridge rail, Type 80, was built and tested in211u001eaccordance with NCHRP Report 350. The Type 80 bridge rail is an 810 mm-tall, 211u001ereinforced concrete barrier. The rail has 280 mm-high by 1620 mm-long gaps, 230 211u001emm above the bridge deck surface. The barrier tested was 23 m-long and was 211u001econstructed at the Caltrans Dynamic Test Facility in West Sacramento, California. 211u001eA total of three crash tests were conducted under Report 350 test Level 4, one 211u001ewith a 820 kg car, one with a 2000 kg pickup truck and one with an 8000 kg single 211u001eunit van truck. The results of all three tests were within the limits of the 211u001eReport 350 guidelines.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号