Record of Decision for the Electrical Interconnection of the Kittitas Valley Wind Project

机译:Kittitas Valley风电项目电气互连决策记录

获取原文

摘要

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 108 megawatts (MW) of power to be generated by the proposed Kittitas Valley Wind Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Sagebrush Power Partners, LLC (Sagebrush) has received authorization from the Washington Energy Facility Site Evaluation Council (EFSEC) to construct and operate the proposed Wind Project in Kittitas County, Washington, and has requested interconnection to the FCRTS on BPAs Columbia-Covington 230-kV transmission line in the vicinity of Ellensburg, Washington. BPA will construct a new substation to accommodate this additional power into the FCRTS. BPAs decision to offer terms to interconnect the Wind Project is consistent with BPAs Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), the Business Plan Record of Decision (BP ROD, August 15, 1995), and the Supplement Analysis to the BP EIS (April 2007). This decision thus is tiered to the BP ROD.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号