首页> 外文会议>Annual Waste Management Symposium >RECORD OF DECISION FOR THE MELTON VALLEY WATERSHED, OAK RIDGE NATIONAL LABORATORY, OAK RIDGE TENNESSEE FROM DECISION DOCUMENT APPROVAL TO PLANNING FOR IMPLEMENTATION
【24h】

RECORD OF DECISION FOR THE MELTON VALLEY WATERSHED, OAK RIDGE NATIONAL LABORATORY, OAK RIDGE TENNESSEE FROM DECISION DOCUMENT APPROVAL TO PLANNING FOR IMPLEMENTATION

机译:奥克岭国家实验室梅尔顿谷流域决定记录,奥克岭田纳西州从决定文件批准计划实施

获取原文

摘要

Much planning was required and undertaken by Bechtel Jacobs Company LLC (BJC) teamed with the Department of Energy (DOE) to prepare for the implementation of a Comprehensive Environmental Response, Compensation, and Liability Act remedial decision encompassing in excess of 200 contaminated sites in the Melton Valley near Oak Ridge, Tennessee. Remedial actions to be implemented include the installation of approximately 150 acres of caps, acres of contaminated soil excavation, decontamination or demolition of numerous contaminated structures, in-situ grouting, in-situ vitrification, water treatment facilities; in all, this remediation effort is estimated to cost in excess of $250 million. The Melton Valley watershed is identified as an area of more than 1062 acres throughout which numerous contaminated sites, ranging in size from 10’s of square feet to more than 40 acres, are located. Included within these waste units are three major radioactive and mixed waste burial grounds, numerous auger holes that were used for the disposal of radioactive waste, seven seepage pits and trenches, nine impoundments, and two deep hydrofracture liquid radioactive waste injection wells. Interspersed throughout the valley are more than 1000 monitoring wells requiring remediation and numerous low-levelliquid waste pipelines and areas of surface contamination. Primary contaminants in Melton Valley include radionuclides (short- and long-lived), metals, and organic compounds (e.g., volatile organic compounds and polychlorinated biphenyls) in waste, soil, groundwater, surface water, sediment, and biota. Migration from shallow groundwater to surface water is the principal exit pathway from contaminant source areas in Melton Valley. The Decision Document Remedial Action Objective was designed with 'source control' as a primary objective. The remedial decision covers over 200 individual primary waste sites; however, some elements are not within the scope of this decision (i.e., long-term stewardship, White Oak Creek and White Oak Lake). Due to the size and complexity of the decisions being made, approval of the Record of Decision for Interim Actions for the Melton Valley Watershed at the Oak Ridge National Laboratory, Oak Ridge, Tennessee comprised an extensive five-year team effort involving DOE, the U.S. Environmental Protection Agency, Tennessee Department of Environment and Conservation, the public, and BJC representatives inclusive. A massive effort was undertaken to plan for the implementation of this sizeable and complex remedial action. Prioritization of remedial actions was primarily based upon risk. Additionally, grouping of like projects was instrumental in realizing implementation efficiencies. Successful completion of this baselining/sequencing effort is credited to the combined efforts of the staff of the ORNL Project Team, including DOE representatives. This effective planning is expected to result in the efficient, cost-effective, and timely implementation of remedial actions in Melton Valley.
机译:必需的规划是由Bechtel Jacobs Company LLC(BJC)与能源部(DOE)合作进行的,为实施全面的环境反应,赔偿和责任法案,补救措施包括超过200个污染地点的补救决定梅尔顿谷附近田纳西州橡树岭。要实施的补救措施包括安装大约150英亩的帽,占污染的土壤挖掘,净化或拆除众多污染的结构,原位灌浆,原位玻璃化,水处理设施;总之,估计该补救措施估计超过2.5亿美元的费用。 Melton Valley流域被确定为1062英亩的面积,众多受污染的位点,范围从10岁的平方英尺到40多英亩。包括在这些废物单元内是三个主要的放射性和混合废物墓地,众多螺旋孔用于处理放射性废物,七个渗流坑和沟渠,九个蓄水池和两个深水箱液体放射性废物井。整个山谷中穿插是1000多个监测井,需要修复和许多低左左左左道废水管和表面污染区域。梅尔顿谷的初级污染物包括废,土壤,地下水,地表水,沉积物和生物群的放射性核素(短寿命),金属和有机化合物(例如,挥发性有机化合物和多氯化双烯基)。从浅地下水到地表水的迁移是梅尔顿谷污染物源区的主要出口途径。决定文件补救行动目标是用“来源控制”为主要目标的设计。补救措施涵盖了200多个初级废物场所;然而,一些元素不在本决定的范围内(即,长期管理,白橡树溪和白橡树湖)。由于所做决定的规模和复杂性,澳大利亚橡树岭国家实验室奥克岭国家实验室奥克尔顿谷分水岭的临时行动裁定记录,田纳西州的努力涉及DOE,美国携带大量的五年努力。环境保护局,田纳西州环境与保护部,公众和BJC代表包容。采取了巨大的努力,计划实施这种大规模和复杂的补救行动。补救措施的优先级主要基于风险。此外,将类似项目的分组在实现实施效率方面是有乐器。成功完成这一基线/序列努力被归功于ORNL项目团队工作人员的综合努力,包括DOE代表。预计这项有效规划将导致梅尔顿谷的有效,成本效益,及时实施补救措施。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号