首页> 美国政府科技报告 >Preliminary Engineering Cost Trends for Highway Projects.
【24h】

Preliminary Engineering Cost Trends for Highway Projects.

机译:公路工程初步工程造价趋势。

获取原文

摘要

Preliminary engineering (PE) for a highway project encompasses two efforts: planning to minimize the physical, social, and human environmental impacts of projects and engineering design to deliver the best alternative. PE efforts begin years in advance of the project's construction letting, often five years or more. An efficient and accurate method to estimate PE costs would benefit transportation departments. Typically, departments estimate PE costs as a percentage of construction costs disregarding other project-specific parameters. By analyzing 461 North Carolina Department of Transportation bridge projects and 188 roadway projects let between 2001 through 2009, the research team developed statistical models linking variation in PE costs and PE duration with distinctive project parameters. The development of a user interface application aids agency users in executing the models to predict a project's PE cost ratio. Modeling strategies included multiple linear regression, hierarchical linear models, Dirichlet process linear models, and multilevel Dirichlet process linear models (MDPLM). The 461 bridge projects exhibited a mean PE cost ratio of 27.8% (ratio of PE cost over estimated construction cost) and a mean PE duration of 66.1 months. Mean PE cost ratio for the 188 roadway projects was 11.7% with a mean PE duration of 55.1 months. Project parameters utilized in the predictive models included project scope classification such as widening or new location, dimensional variables (project length, structure length, detour length, and number of spans); geographical region; and estimated costs for construction and right of way.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号