首页> 美国政府科技报告 >Construction Control of Rigid Pavement Roughness
【24h】

Construction Control of Rigid Pavement Roughness

机译:刚性路面不平度的施工控制

获取原文

摘要

Results of a 2-yr study of cause-effect relationships involved in roughness of concrete pavements are reported. Data were derived both from analog traces obtained with a profilograph in each wheelpath of randomly selected pavements within hours after placement, and from qualitative observations of placement methods. Construction sampled consisted of 184 sections of one - and - two - lane pavements built under 62 different contracts with seven different form-type finishing machines and three different slip-form pavers. Statistical analysis was held to a minimum because of uncontrolled interactions; however, five factors were found to be common and outstanding significant throughout the contracts studied. High roughness was related (1) to backing up of the last finishing machine, (2) to absence of a float, (3) to use of less than three screeds, (4) to use of a crown section, and (5) to lane-at-a-time paving. Eigh other construction phenomena producing roughness, common to many projects but found less frequently than the five just listed, are also covered in some detail. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号