首页> 美国政府科技报告 >Eight-Piece Concrete Sets for Small Mine Openings: A Progress Report
【24h】

Eight-Piece Concrete Sets for Small Mine Openings: A Progress Report

机译:小型矿井开采的八件套混凝土组:进展报告

获取原文

摘要

To further investigate the potential of precast concrete sets as a support medium for underground mines, the Bureau of Mines designed an eight-piece precast reinforced concrete drift set for a small opening. Twenty-two sets of three different member sizes were tested to destruction under two loading conditions. A discussion of the test results and typical failure patterns is presented. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号