首页> 美国政府科技报告 >Northeast Corridor Improvement Project Task 202:Concrete Tie Cost and Performance for Track Structures.
【24h】

Northeast Corridor Improvement Project Task 202:Concrete Tie Cost and Performance for Track Structures.

机译:东北走廊改善项目任务202:轨道结构的具体联系成本和性能。

获取原文

摘要

As a result of a survey of the Northeast Corridor,it was determined that 1,100miles of track require upgrading to meet the trip-time goals set forth in the Railroad Revitalization and Regulatory Reform Act of 1976. As a part of the determination of the best way to meet these requirements,two types of ties and three methods of reconditioning track were evaluated. A comparative analysis was performed on the three methods of reconditioning track:component replacement of wood-tie track with traditional spike fasteners,complete rebuilding of track with preplated wood ties and elastic fasteners,and complete rebuilding of track with concrete ties and elastic fasteners. Differences in the methods were analyzed with regard to productivity rates,cost,and performance.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号