I enjoyed Bob Johnston's article, "Bridge Out!" [pages 38-45, February], about the bridges along the Northeast Corridor between Washington, D.C., and Boston. I managed the Recovery Act grant that paid for much of the replacement of the Niantic River bridge as a Federal Railroad Administration employee at the time. The lesson to take from the article is that there's a high cost to the feast and famine way that Congress funds Am-trak. An example is the replacement of the lift span of the Thames River bridge. While it was completed without a special appropriation, Amtrak had to defer other vital capital projects on the Northeast Corridor to finance the project.
机译:我喜欢鲍勃·约翰斯顿(Bob Johnston)的文章“ Bridge Out!” [2月,第38-45页],介绍了华盛顿特区和波士顿之间沿东北走廊的桥梁。我管理了《恢复法》(Recovery Act)赠款,该笔赠款作为当时联邦铁路管理局的一名员工,为Niantic河大桥的大部分更换工作支付了费用。这篇文章的教训是,国会资助Am-trak的盛宴和饥荒方式成本很高。一个例子是更换泰晤士河大桥的升程。在没有特别拨款的情况下完成工程时,Amtrak不得不推迟东北走廊的其他重要资本项目,以为该项目筹集资金。

著录项

  • 来源
    《Trains》 |2014年第4期|5-5|共1页
  • 作者

    Dharm Guruswamy;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号