Field Test of Deep Cutting Double Arm Shearer

机译:深切双臂采煤机的现场试验

获取原文

摘要

A field test was conducted to demonstrate the deep cutting principle in relation to the creation of airborne respirable dust when longwall mining with a double-ended, ranging drum shearer. The test was carried out on the 3 North Longwall at the Quarto No. 4 Mine in Clarington, Ohio. Continuous recordings of dust levels were made at midface and near the tailgate on 27 shifts during which time 81 mining cycles took place. Drum speed and number of picks per line were varied systematically over this period. At the midface position there was a strong association between drum speed and number of picks with the level of airborne respirable dust, drum speed had a much stronger effect than number of picks over the experimental range, since a halving of drum speed reduced dust levels by approximately 60 percent while removal of every other vane pick resulted in only a 20 percent reduction. At the tailgate position, however, neither effect was strongly apparent. A tendency for the slower drum speeds to be associated with reduced power consumption and higher haulage speeds (and therefore production rates) was also noted. It is recommended that longwall operators operate at the lowest available drum speed wherever possible.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号