首页> 美国政府科技报告 >Arch Canopy Design Procedure for Rehabilitation of High-Roof-Fall Areas
【24h】

Arch Canopy Design Procedure for Rehabilitation of High-Roof-Fall Areas

机译:高顶棚区域修复的拱顶设计程序

获取原文

摘要

The Bureau of Mines report presents a procedure for the design of an arch canopy for use in rehabilitating a high-roof-fall area. Only dynamic line loading of an unbackfilled arch canopy at its crown is considered, and the procedure does not account for an asymmetrical loading condition. The evaluation of whether an arch canopy is suitable for a particular installation depends on many variables, including in-mine conditions and the engineering properties of the structure. However, a general evaluation can be based on a comparison of the arch's maximum crown deflection and a prescribed allowable crown deflection. The design procedure is based on the concept that when an arch canopy is subjected to impact loading at its crown and deflects from its unloaded state to maximum crown deflection, the structure absorbs strain energy, both elastic and plastic. As a result, this strain energy can be calculated from a static load-displacement diagram for the structure. The significance of this design procedure is that it gives mine personnel an analytical tool to select an arch canopy to meet the dimensional and functional requirements of a mine entry and a prescribed allowable crown deflection.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号