首页> 美国政府科技报告 >In-Vessel Inspection Before Head Removal: TMI II, Phase III (Tooling and Systems Design and Verification)
【24h】

In-Vessel Inspection Before Head Removal: TMI II, Phase III (Tooling and Systems Design and Verification)

机译:头部拆卸前的船内检查:TmI II,第三阶段(工具和系统设计和验证)

获取原文

摘要

Under EG and G contract K-9003 to General Public Utilities Corporation, a Task Order was assigned to Babcock and Wilcox to develop and provide equipment to facilitate early assessment of core damage in the Three Mile Island Unit 2 reactor vessel head. Described is the work performed, the equipment developed, and the tests conducted with this equipment on various mockups used to simulate the constraints inside and outside the reactor vessel that affect the performance of the inspection. The tooling developed provides several methods of removing a few control rod drive leadscrews from the reactor, thereby providing paths into which cameras and lights may be inserted to permit video viewing of many potentially damaged areas in the reactor vessel. The tools, equipment, and cameras demonstrated that these tasks could be accomplished. (ERA citation 08:000551)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号