This report, "Design/Cost Tradeoff Studies," has been prepared for NASA/GSFC under Contract NAS 5-20518, EOS System Definition Study. It presents the results of the significant design/cost tradeoffs made during the first three months of the study and presents summary costs for the total program for selected mission options.
展开▼