Engineering work plan for PFP criticality alarm panel first unit re-build

机译:pFp关键性报警面板第一单元重建的工程工作计划

获取原文

摘要

This document describes the first step in increasing the quality, reliability, and ease of maintenance of the nine Criticality Alarm Panels (CAP) at PFP. Development control practices and guidelines of WHC-CM-6-1, EP-2.4 and WHC-IP-1026, EPG-2.4 are applied to develop a prototype of a replacement Criticality Alarm Panel (CAP) with facility-use potential. During the development of the prototype CAP, the design requirements of all of PFP's nine CAPs are considered to develop standardized hardware and detailed design drawings that are tailored to PFP maintenance needs. Increased quality and reliability is achieved through quality hardware, proven technology and design techniques, and the use of the Class 1E workmanship standards of WHC-CM-8-1. The end result of the work described by this work plan is a verified/read-to-install replacement for CAP Z4 and verified/released H-2 drawings that are formatted such that they can easily be replicated when producing design drawings for the other eight CAPs. (Atomindex citation 26:005594)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号