首页> 美国政府科技报告 >Criticality safety for deactivation of the Rover dry headend process
【24h】

Criticality safety for deactivation of the Rover dry headend process

机译:停用Rover干燥前端过程的关键性安全性

获取原文

摘要

The Rover dry headend process combusted Rover graphite fuels in preparation for dissolution and solvent extraction for the recovery of (sup 235)U. At the end of the Rover processing campaign, significant quantities of (sup 235)U were left in the dry system. The Rover Dry Headend Process Deactivation Project goal is to remove the remaining uranium bearing material (UBM) from the dry system and then decontaminate the cells. Criticality safety issues associated with the Rover Deactivation Project have been influenced by project design refinement and schedule acceleration initiatives. The uranium ash composition used for calculations must envelope a wide range of material compositions, and yet result in cost effective final packaging and storage. Innovative thinking must be used to provide a timely safety authorization basis while the project design continues to be refined.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号