首页> 美国政府科技报告 >Investigation of the potential impacts from tritium soil contamination in the CP-5 yard
【24h】

Investigation of the potential impacts from tritium soil contamination in the CP-5 yard

机译:调查Cp-5堆场中氚土污染的潜在影响

获取原文

摘要

Based on a review of available data, significant contributions to low-level tritium soil contamination in the CP-5 yard have been made by airborne tritium fallout and rainout from the CP-5 ventilation system stack. Based on the distribution of tritium in the yard, it is also likely that leaks in secondary system piping which lead to the cooling towers were a significant contributor to tritium in CP-5 yard subsurface soil. Based on the foregoing analysis, low-level tritium contamination will not prohibit the release of the yard for unrestricted use in the future. Worst case dose estimates based on very conservative assumptions indicate that a 25 rmem annual effective dose equivalent limit will not be exceeded under the most restrictive residential-use family farm scenario. Given the impermeable nature of the glacial till under CP-5, low-level concentrations of tritium may be occasionally detected in the deep well (3300 12D), but the peak concentration will not approach the levels calculated by RESRAD; however, continued monitoring of the deep well is recommended. To ensure that all sources of potential tritium release have been removed from the CP-5 complex, removal of tritiated water from each rod-out hole and an evaluation of the physical integrity of the rod-out holes is recommended. This will also allow for an evaluation of tritium concentrations in shallow groundwater under CP-5 by sampling groundwater that is currently being forced into the drain tile system. Additional surface and subsurface soil sampling and analysis will be required to determine the final release status of soils around the Building 330 complex relative to elevated concentrations of CS-137, CO-60,Co-57, and Eu-152 identified during the 1993 IT Corporation characterization. The potential radiological impact from isolated elevations of the latter radionuclides is relatively low and can be evaluated as part of the final status survey of outdoor areas surrounding the Building 330 complex. In summary, the following activities are recommended: Remove tritiated water from each rod-out hole; Monitor rod-out hole tritium concentrations as they fill up with shallow groundwater; Continue groundwater monitoring and Perform surface and subsurface soil sampling around the CP-5 complex as part of the final status survey.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号