首页> 美国政府科技报告 >CASIM and ground water activation calculations at the A0 abort
【24h】

CASIM and ground water activation calculations at the A0 abort

机译:在a0中止的CasIm和地下水激活计算

获取原文

摘要

The results of CASIM and ground water activation calculations for the A0 abort is presented in this paper. CASIM calculations were done at 150 GeV and 1 TeV for the following transverse beam sizes ({sigma}x{sigma}y): (0.15 x 0.15)mm{sup 2}, (0.15 x 0.15)cm{sup 2}, and (1.5 x 1.5)cm{sup 2}. The results from CASIM were used to calculate the ground water activation using the Concentration Model. The results show that there is only a weak dependence on the transverse beam size and that the maximum number of protons which can be aborted at A0 per year is 7.6 x 10{sup 16} protons/year {at} 150 GeV and 1.7 x 10{sup 16} protons/year {at} 1 TeV.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号