首页> 美国政府科技报告 >BPA-Solicited Technical Review of 'Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline', Technical Report 2004
【24h】

BPA-Solicited Technical Review of 'Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline', Technical Report 2004

机译:Bpa征求“Echo meadows项目冬季人工补给:2001年基线最终报告”的技术评论,2004年技术报告

获取原文

摘要

The purpose of this report was to provide, at BPA's request, a technical review of interim products received for Project 2001-015-00 under contract 6925. BPA sometimes solicits technical reviews for Fish and Wildlife products or issues where outside expertise is required. External review of complex project deliverables assures BPA as a funding agency that the contractor is continuing with scientifically-credible experimental techniques envisioned in the original proposal. If the project's methodology proves feasible, there could be potential applications beyond the project area to similar situations in the Columbia Basin. The Experiment involves artificial flooding during high flow periods and a determination of the portion of the return flows that end up in the Umatilla River during low flow months and within acceptable water quality parameters (e.g., low temperature, few contaminants). Flooding could be a critical water source for aquatic organisms at times of the year when flows in the lower reaches of the Umatilla River are low and water is warmer than would be desired. The experiment was proposed to test whether 'this process, recharges the shallow aquifers of the old flood plain, for natural filtration through the alluvial soils as it returns to the Umatilla River, cleaner and cooler (about 50 degree Fahrenheit) five to six month later (about July and August) substantially cooling the river and (making it) more beneficial to anadromous (fish)'. A substantial amount of preliminary data had been collected and preliminary results were submitted in an interim report 'Echo Meadows Project Winter Artificial Recharge: Final Report for 2001 Baseline (December 2002)'. A substantial amount of addition funding was provided for the last cycle of flooding (Phases II) and final analyses of the full compliment of data collected over the life of the contract (Phase III). Third party scientific review may assist the contractor in producing a higher quality Final Report with completion of the final 2 phases of the project.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号