首页> 美国政府科技报告 >Report on Plutonium Mining Activities at 216-Z-9 Enclosed Trench
【24h】

Report on Plutonium Mining Activities at 216-Z-9 Enclosed Trench

机译:关于216-Z-9封闭沟的钚采矿活动的报告

获取原文

摘要

This report is divided into three major sections. The first section describes the 216-Z-9 enclosed trench prior to the mining operation. An overall history of the enclosed trench is presented with nuclear reactivity evaluations of the soil. The second section discusses the mining phase of the enclosed trench. Descriptions of the mining equipment and mining operations are contained in this section as well as statistics and problems encountered in the operations. This section concludes with reports on post mining phase operations: the monitoring of radiolytically produced gases and the retrofit program to make Z-9 drums safe for 20-year retrievable storage. The final section summarizes what was learned in doing the program. (ERA citation 04:052696)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号