首页> 美国政府科技报告 >Specification Requirements for a Control Valve for Slurry Letdown Service
【24h】

Specification Requirements for a Control Valve for Slurry Letdown Service

机译:泥浆降落服务控制阀的规范要求

获取原文

摘要

The conditions for this valve were derived from the Gulf Science and Technology Company SRC-II process demonstration plant. The first valve (V1) must let down pressure from 2000 psi to 460 psi, a total delta P of 1540 psi, with the other valves (V2, V3, V4) each experiencing a lesser drop. It should be noted that temperatures throughout the pressure letdown system are, at the lowest, seven hundred and seventy-five degrees Fahrenheit, but with a possible maximum to eight hundred degrees Fahrenheit. Due to the carcinogenic nature of certain compounds in the coal slurry, the maintenance of valves in the field and under process run conditions is inadvisable. All maintenance will be performed during regularly scheduled annual turnaround periods, at which times all lines carrying slurry can be flushed with solvent and steam prior to opening up for maintenance. With the above constraints, it has been determined that letdown stations to each vessel will have a group of letdown valves in parallel. Each will have a tight shutoff block valve or valves upstream of the letdown valve. Thus, as a letdown valve becomes eroded to the point of uncontrollability, it may be isolated and the secondary valve put into service. (ERA citation 04:055970)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号