The problems of radiation protection for persons entering and working in a nuclear power station have to be dealt with at every stage in the construction and operation of that power station. It is a problem for the designers and manufacturers of nuclear plant, particularly the manufacturer of the nuclear steam supply system. It is also an important problem for the architect, as he is largely responsible for the layout of the plant. Finally, it is a crucial problem for the operator since he has to cope with all the difficulties caused by inadequacies in the design of the radiation protection system of the power station when it is handed over to him. The operator will of course be aware of all the defects in his installation, particularly those concerning radiation protection, but he will only be able to deal with them in a limited way. This paper discusses the lessons learned from the first unit at Tihange and then describes various modifications which have been made as a result and which will mean improvements in two additional units currently under construction. (ERA citation 10:013179)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号