首页> 美国政府科技报告 >Environmental Assessment of Proposed Lynch Creek Substation Project: Service to Eatonville and the Ohop Valley
【24h】

Environmental Assessment of Proposed Lynch Creek Substation Project: Service to Eatonville and the Ohop Valley

机译:建议的Lynch Creek变电站项目的环境评估:为Eatonville和Ohop Valley提供服务

获取原文

摘要

Bonneville Power Administation (BPA) proposes to construct 3.2 miles of 115-kV transmission line from a tap point on Tacoma City Light's Cowlitz-LaGrande 115-kV line to a new 115/12.5-kV, 15/20/25 MVA substation to be located about 1 mile northwest of Eatonville, adjacent to the Eatonville cutoff road. This plan was selected following initial consideration of five alternative plans for satisfying electrical needs in the project area and following agreement with BPA's customers on a vicinity for the substation site. The vicinity selected is midway between the two load centers and would require the least construction of distribution line. Subsequently, four alternative line routes and two substation sites have been evaluated. These alternatives provide a range of costs, engineering solutions, and potential environmental impacts. This evaluation led to the selection of one line route. This document describes possible environmental impacts of the proposed actions. 7 refs, 9 figs., 5 tabs.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号