首页> 美国政府科技报告 >Brief Reconnaissance Studies for the Addition of Hydropower in Puerto Rico. Report No. 2
【24h】

Brief Reconnaissance Studies for the Addition of Hydropower in Puerto Rico. Report No. 2

机译:波多黎各增加水电的简​​要侦察研究。第2号报告

获取原文

摘要

Nine dams and hydroelectric sites were visited during a trip to Puerto Rico in August 1983. Seven brief reconnaissance reports were prepared to describe the hydroelectric potential at those sites. Information on Isabela Plant No. 4 was summarized, and a small diversion dam on Rio Turabo was not reported because the only head that could be developed was four feet. Site description and data, plant characteristics and power potential, project economics, and photographs are included for each site. Of the seven sites that were evaluated, the economic feasibility of hydroelectric development was positive for three, marginal for one, and negative for three. (ERA citation 09:009573)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号