首页> 美国政府科技报告 >United States Department of Energy, Strategic Petroleum Reserve: Phase 2, CERCLA (Comprehensive Environmental Response Compensation Liability Act) Report: Confirmation
【24h】

United States Department of Energy, Strategic Petroleum Reserve: Phase 2, CERCLA (Comprehensive Environmental Response Compensation Liability Act) Report: Confirmation

机译:美国能源部,战略石油储备:第2阶段,CERCLa(综合环境响应赔偿责任法案)报告:确认

获取原文

摘要

This report was prepared on behalf of the Department of Energy (DOE) by Boeing Petroleum Services, Inc. the management, operations, and maintenance contractor to DOE for the Strategic Petroleum Reserve. DOE Order 5480.14 requires all DOE-owned sites to achieve compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). In accordance with the understanding reached between BPS and DOE, and as set forth in the letter dated March 28, 1985, DOE is the owner and operator of the SPR. This report fulfills Phase II (Confirmation) of that order, which is to conduct sampling at the areas of potential hazardous waste identified in the Installation Assessment (Phase I) to confirm the presence or absence of hazardous waste. Recommendations to proceed to the Engineering Assessment (Phase III) are made for areas where the presence of hazardous waste is confirmed. In Phase I, recommendations for further sampling were made for the Bayou Choctaw, Big Hill, Bryan Mound, and Sulphur Mines sites. This sampling was carried out as Phase II. Findings from that sampling are presented in this report. Recommendations to proceed to Engineering Assessment were made for Bayous Choctaw cavern 10 and for the Big Hill wells. 11 figs., 39 tabs. (ERA citation 12:028328)

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号