首页> 美国政府科技报告 >Depot-Level Simulation and Multivariate Analysis on B-1 High Velocity Maintenance
【24h】

Depot-Level Simulation and Multivariate Analysis on B-1 High Velocity Maintenance

机译:B-1高速维修的仓库级仿真及多变量分析

获取原文

摘要

The objective of this thesis is to gain insights on the B-1B depot maintenance operations, with a focus on direct maintenance hours or burn rate, under the implementation of High Velocity Maintenance (HVM). Based on historical depot maintenance data and the current B-1 depot HVM prototype data, a discrete-event simulation model is developed using Arena 12.0. Some United States Air Force supply chain influences, such as manning levels and kitting characteristics of the B-1 depot operations, are incorporated in our models as design factors. The model captures the stochastic nature of 30 HVM tasks performed on one B-1 aircraft in a representative HVM cycle at the B-1 depot located in Oklahoma City Air Logistics Center, Tinker Air Force Base. To examine the impact of HVM, we vary the levels of the design factors and conduct a design of experiment (DOE). The DOE analysis reveals that manning levels and kitting characteristics have statistically significant impact on some HVM task completion times, which are used collectively as a surrogate measure for burn rate. In particular, manning schedule with a centric focus on direct maintenance, high task kit availability, and small kit deficiency produce the highest burn rate. Additionally, by performing multivariate analysis, we are able to reduce the dimensionality of the output statistics and conclude that kit deficiency is the main driver for HVM task duration with our simulation.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号