首页> 美国政府科技报告 >Statistical PERT: Improvements in the Determination of the Project Completion Time Distribution.
【24h】

Statistical PERT: Improvements in the Determination of the Project Completion Time Distribution.

机译:统计pERT:确定项目完成时间分布的改进。

获取原文

摘要

The report develops improvements to a new project scheduling procedure, Statistical PERT, being developed at the Institute of Statistics, Texas A and M University. The project scheduling algorithm is a five step iterative procedure capable of determining a minimum cost project schedule when the activities making up the project have durations which are random variables. The cost of an activity is assumed to be a convex piecewise linear function of the activity's mean duration. The problem is to determine the activity mean durations which both minimize the total project cost and insure that the mean (or some specified percentile) of the corresponding project completion time distribution is less than or equal to a specified project deadline. The entire distribution of the project's completion time under the minimum cost schedule is a valuable by-product.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号