首页> 美国政府科技报告 >Section 32 Program: Streambank Erosion Control Evaluation and Demonstration. Work Unit 2. Evaluation of Existing Bank Protection. Field Inspection of Sites in the Vicksburg District in the Upper Yazoo Basin
【24h】

Section 32 Program: Streambank Erosion Control Evaluation and Demonstration. Work Unit 2. Evaluation of Existing Bank Protection. Field Inspection of Sites in the Vicksburg District in the Upper Yazoo Basin

机译:第32节计划:streambank侵蚀控制评估和示范。工作单元2.对现有银行保护的评估。 Yazoo盆地上部Vicksburg区遗址的现场检查

获取原文

摘要

Section 32 existing and demonstration sites in the Vicksburg District (LMK) were inspected from 11-13 October 1977 by the U.S. Army Engineer Waterways Experiment Station (WES) evaluation team. These sites were located on the North and South Forks of Tillatoba Creek (Tallahatchie County, Mississippi), Hunter Creek (Tallahatchie Country, Mississippi), and Batupan Bogue (Grenada County, Mississippi).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号