首页> 美国政府科技报告 >Feasibility of Using Alternative Models for Determining Reserve Naval Mobile Construction Force Material Readiness
【24h】

Feasibility of Using Alternative Models for Determining Reserve Naval Mobile Construction Force Material Readiness

机译:使用替代模型确定储备海军移动施工人员材料准备情况的可行性

获取原文

摘要

This thesis explores the feasibility of using alternative models for determining the material readiness or Reserve Naval Construction Force units. There is no system currently in place to measure and determine either the readiness contribution of the equipment and supplies on hand for these forces, or the material condition of the essential combat and major end items that will be used to carry out the wartime mission. Alternative models are explored to enable an accurate assessment of the individual unit's readiness posture and to portray this in appropriate format to the Joint Chiefs of Staff via the UNITREP (Unit Status and Reporting) system.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号