Contracting Issues Associated with Reduction of Repair Turnaround Time Within the Contract Depot Maintenance (CDM) Program

机译:合同仓库维护(CDm)计划中与减少维修周转时间相关的合同问题

获取原文

摘要

This thesis examines the key contracting issues that have caused Repair Turnaround Time (RTAT) of Depot-Level Repairables (DLR's) under the Contractor Depot Maintenance (CDM) program to be excessive. Many of the DLR's repaired by commercial depots under this program exceed the Naval Supply System Command's goal of 60 days for items managed by the Navy Ships Part Control Center (SPCC) and 45 days for items managed by the Aviation Supply Office (ASO). SPCC, ASO and four commercial depots were visited to gather RTAT data on DLR's and identify potential improvements in the CDM program that would reduce RTAT. An analysis of the policies and procedures used by SPCC and ASO in requirements determination as well as the effects of the repair workload forecast on the CDM process was also conducted. Recommendations are made to reduce RTAT through the contractual vehicle utilized and enhanced demand forecasting.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号