【24h】

PLANNING AND SCHEDULING:HOW WELL ARE YOU DOING?

机译:计划和时间表:您做得如何?

获取原文
获取原文并翻译 | 示例
           

摘要

Most mills have implemented maintenance planning and scheduling to some degree,but the effect on productivity and reliability varies depending on how well it is implemented.Improved planning and scheduling procedures lead to higher production and lower manufacturing and maintenance costs.A study of 19 similar paper machines operated by the same company showed a direct relationship between increased levels of planning and scheduling and both lower maintenance costs and higher machine availability(see Figure 1).Higher machine availability translates directly into increased production volume.
机译:大多数工厂都在一定程度上实施了维护计划和调度,但是对生产率和可靠性的影响取决于实施的程度。改进的计划和调度程序可以提高产量,降低制造和维护成本。研究19篇类似的论文由同一家公司运营的机器显示出更高的计划和调度水平,更低的维护成本和更高的机器可用性之间的直接关系(见图1)。更高的机器可用性直接转化为产量的增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号