首页> 外文期刊>PET Planet >Advanced preform base geometry to improve the blow moulding process Injection moulding with preforms - does it always have to be this way?
【24h】

Advanced preform base geometry to improve the blow moulding process Injection moulding with preforms - does it always have to be this way?

机译:先进的瓶坯基础几何形状,以改善吹塑工艺瓶坯的注射成型-是否总是必须这样?

获取原文
获取原文并翻译 | 示例
           

摘要

The injection moulding process has its limits, in terms of design to produce tailor made preforms, especially in regards to the base wallthickness and undercuts. Blow moulding systems can not manufacture perfect bottle bases with the available preforms on the market. Reality is that these two facts results in blown bottles where almost on all bottle bases a waste rate of 2-10% of PET material appears. Mahir Aktas, CEO Creative Packaging Solutions (CPS), Turkey, therefore came to the conclusion that the base area has to be formed outside the tool and invented the minting of the preform base geometry in the post mould cooling station.
机译:就生产量身定制的瓶坯的设计而言,注塑工艺有其局限性,特别是在基础壁厚和底切方面。吹塑系统不能用市场上可用的瓶坯来制造完美的瓶底。现实情况是,这两个事实导致了吹瓶,几乎在所有瓶座上都出现2-10%的PET材料浪费率。因此,土耳其创意包装解决方案(CPS)首席执行官Mahir Aktas得出结论,必须在工具外部形成基础区域,并发明了在后模具冷却站中铸造预成型坯基础几何形状的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号