首页> 外文期刊>Petroleum Review >Decommissioning offshore pipeline bundles
【24h】

Decommissioning offshore pipeline bundles

机译:退役海上管道束

获取原文
获取原文并翻译 | 示例
       

摘要

A new study which aims to inform UK government guidelines on environmentally responsible methods for decommissioning offshore pipeline bundles was launched in November. The study was secured with assistance from ITF, the technology facilitator for the global oil and gas industry. Currently, there is no guidance for the industry on decommissioning pipeline bundles and the study aims to provide a basis for the Department of Energy and Climate Change (DECC) and stakeholders to assess decommissioning proposals.More than 470 offshore installations, 10,000 km of pipelines, 15 onshore terminals and around 5,000 wells constitute part of the North Sea infrastructure which will eventually need to be decommissioned in the UK continental shelf (UKCS) at an estimated cost of between £20bn and £25bn.
机译:11月启动了一项新研究,旨在为英国政府有关退役海上管道束的环保方法提供指导。该研究在全球石油和天然气行业技术促进者ITF的协助下获得了保证。目前,该行业尚无关于退役管道束的指南,该研究旨在为能源与气候变化部(DECC)和利益相关者评估退役提案提供依据。470多个海上设施,10,000公里的管道,北海基础设施包括15个陆上码头和约5,000口井,这些设施最终将需要在英国大陆架(UKCS)退役,估计费用在200亿至250亿英镑之间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号