首页> 外文期刊>Petroleum Review >Moving from fixed to flexible contracts
【24h】

Moving from fixed to flexible contracts

机译:从固定合同转变为灵活合同

获取原文
获取原文并翻译 | 示例
       

摘要

The UK's principal business to business(B2B)power suppliers-bar British Energy(the nuclear generator)-have little to no wholesale volumes of generated power to sell to B2B buyers.EOF Energy,E.ON Energy and RWE npower chiefly use power generation assets to provide a structural hedge to the more stable customer base of residential and small and medium enterprise(SME)customers.Scottish and Southern Energy(SSE)and ScottishPower do have an excess of power generation,but British Energy is the only supplier that can be classified as asset-heavy in supplying major energy user(MEU)buyers.As a result,the vast majority of contracts are provided on the basis of a price that is determined by the wholesale forward price quoted on that day,plus supplier costs and margin.
机译:英国主要的企业对企业(B2B)电力供应商-英国能源(核能发电公司)-很少有批发量的发电量出售给B2B买家.EOF Energy,E.ON Energy和RWE npower主要使用发电资产可为更稳定的住宅和中小型企业(SME)客户群提供结构性对冲。苏格兰和南方能源(SSE)和ScottishPower确实发电量过剩,但英国能源是唯一可以因此,在提供主要能源用户(MEU)买方时被归类为重资产。因此,绝大多数合同是根据当日报价的批发远期价格加上供应商成本和保证金。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号