首页> 外文期刊>Petroleum Review >High prices spur develoopment rush as North Sea production declines
【24h】

High prices spur develoopment rush as North Sea production declines

机译:高价格刺激了北海产量下降的发展趋势

获取原文
获取原文并翻译 | 示例
       

摘要

The UK sector has seen BP press ahead with development of the 2003 Farragon oil find in block 16/28 as a two-well tie-back to Andtew,with a January 2005 start-up and a potential peak flow of 40,000 b/d.Meanwhile,ChevronTexaco has announced the go-ahead for Captain C,a subsea development of another sector of this well established North Sea heavy oil field.ExxonMobil is to develop the 130bn cf Arthur gas field(ex Camelot SE)as a tie-back to Thames for an end-2004 start-up.Tullow is planning to develop the Home and Wren gas fields in blocks 53/3c and 53/4b,with production flowing via Thames and giving a combined flow of 90mn cf/d after start-up in April 2005.
机译:英国石油公司已经看到英国石油公司在16/28区块开发2003年Farragon石油,这是与Andtew的两口井回油井,2005年1月投产,潜在峰值流量为40,000 b / d。同时,雪佛龙德士古公司宣布将批准C船长,这是该成熟的北海稠油油田另一个部门的海底开发。埃克森美孚公司将开发1300亿立方英尺的阿瑟气田(Camelot SE),以与泰晤士河将于2004年底启动。Tullow计划在53 / 3c和53 / 4b区块开发Home和Wren气田,生产流经泰晤士河,启动后总流量为9000万cf / d在2005年4月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号