首页> 外文期刊>Petroleum Review >Full gas production from Juliet field
【24h】

Full gas production from Juliet field

机译:朱丽叶油田的全部天然气生产

获取原文
获取原文并翻译 | 示例
       

摘要

GDF Suez (operator, 51.56%) has commenced gas production from the second of two development wells on the Juliet field, a subsea development on the western flank of the Southern Gas Basin. This follows first gas from the initial development well at the start of the year. The field is now producing at a plateau rate of 80mn cf/d, equivalent to 400,000 barrels a month. The fast track project was delivered in a time frame of less than 18 months from sanction to first gas. Produced gas is being transported by a 22-km long pipeline to the Pickerill A platform and then transported onshore via the existing export pipeline to the Theddlethorpe gas terminal. Juliet has gross associated reserves of 11.6mn boe and lies in block 47/14b, licence P614. Field partners are First Oil Expro (29.44%) and Hansa Hydrocarbons (19%).
机译:GDF Suez(运营商,占51.56%)已经从朱丽叶油田的两个开发井中的第二个开始生产天然气,该油田位于南部天然气盆地西侧的海底开发中。这是在今年年初从最初的开发井开始的第一口天然气。现在,该油田的稳定产量为8000万立方英尺/天,相当于每月40万桶。快速通道项目在从批准到首次使用天然气不到18个月的时间内交付。产生的天然气通过22公里长的管道输送到Pickerill A平台,然后通过现有的出口管道陆上输送到Theddlethorpe天然气码头。朱丽叶(Juliet)的总相关储量为1,160万桶油当量,位于47 / 14b区块,编号P614。现场合作伙伴是First Oil Expro(29.44%)和Hansa Hydrocarbons(19%)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号