首页> 外文期刊>Southwest Contractor >Las Vegas Activity Report
【24h】

Las Vegas Activity Report

机译:拉斯维加斯活动报告

获取原文
获取原文并翻译 | 示例
       

摘要

Just last year in our 2007 Las Vegas Activity Report, we reported that there were over 35 billion dollars in projects planned through 2010. Since then, several very high profile projects have been put on hold due to the deepening financial and credit crunch. After construction had progressed for more than a year, Boyd Gaming Corp. halted work on the 4.8 billion dollars Echelon citing the difficult capital market climate and weakening economic conditions. Approximately 500 million dollars of work had already been completed by New York-based general contractor Tishman Construction Corp.
机译:就在去年的《 2007年拉斯维加斯活动报告》中,我们报告说,到2010年,计划中的项目超过350亿美元。此后,由于金融和信贷紧缩的加剧,一些非常引人注目的项目被搁置。经过一年多的建设,博伊德博彩公司(Boyd Gaming Corp.)以艰难的资本市场气候和疲软的经济状况为由,暂停了这座48亿美元梯队的建设。纽约总承包商铁狮门建筑公司已经完成了约5亿美元的工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号