首页> 外文期刊>Southwest Contractor >Massive 250-Million dollars Land Development Project Completed
【24h】

Massive 250-Million dollars Land Development Project Completed

机译:2.5亿美元土地开发项目完成

获取原文
获取原文并翻译 | 示例
       

摘要

The 250-million dollars Ascaya Residential Land Development wrapped up in August. Located in the McCullough Mountain range in Henderson, the raw land originally consisted of rugged terrain nestled in canyons, valleys and hillsides. General contractor Fisher Sand and Gravel Co. took on the challenging project in November 2004. The project was designed by CVL Consultants as a series of unique flat pads with infrastructure already installed, allowing no further disturbance to the land once the pads were topped off. This entailed drilling, blasting and relocating 15 million cu yds of solid rock consisting of cuts in excess of 140 ft deep adjacent to 400 ft vertical ravines to create a serene appearance unlike any other housing complex. The location provides views of both the Las Vegas strip and preserved conservation area.
机译:耗资2.5亿美元的Ascaya住宅用地开发计划在8月结束。原始土地位于亨德森(Henderson)的麦卡洛山脉(McCullough Mountain)范围内,最初由崎in的地形组成,依nest在峡谷,山谷和山坡上。总承包商Fisher Sand and Gravel Co.于2004年11月进行了具有挑战性的项目。该项目由CVL顾问公司设计,是一系列独特的平垫,已经安装了基础设施,一旦垫上垫层,就不会再对土地造成干扰。这需要对1,500万立方米的固体岩石进行钻探,爆破和重新安置,其中包括与400英尺垂直沟壑相邻,深度超过140英尺的切口,以创造出与其他房屋群不同的宁静外观。该位置可欣赏到拉斯维加斯大道和保存完好的保护区。

著录项

  • 来源
    《Southwest Contractor》 |2009年第10期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 15:04:01

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号