High Capacity Hoisting Systems-Shaft Hoisting System for the Olympic Dam Project

机译:大容量起重系统-奥林匹克大坝项目的竖井起重系统

获取原文
获取原文并翻译 | 示例
           

摘要

In late 1996, Western Mining of Australia planned a major production increase at its underground copper/uranium mine, Olympic Dam. The large increase necessitated a complete new shaft and high-capacity hoisting system. With help from SIEMAG, the new production shaft hoisting system was designed, manufactured, installed and commissioned in the record time of only two years. SIEMAG worked hand-in-hand with the customer and shaft-sinkers to assure timely delivery of the system.The new system produces 10.2 million tons (9.27 million metric tons) per year from 2800 feet (850 meters) deep. It features the modern hoisting technology available including a 4-rope, 5-meter diameter, 6500-kW SIEMAG integrated motor Koepe hoist. Other improvements and safety features include headframe-tension guide ropes with continuous monitoring, multi-channel closed-loop brake control circuits, and mechanical arrestor devices for overtravel protection.
机译:1996年底,澳大利亚西部矿业计划在其地下铜/铀矿“奥林匹克大坝”中大幅度提高产量。大量增加需要一个全新的竖井和大容量提升系统。在SIEMAG的帮助下,新生产的竖井提升系统的设计,制造,安装和调试仅用了两年的时间。 SIEMAG与客户和凿岩机紧密合作,以确保及时交付该系统。新系统每年从2800英尺(850米)深处产生1020万吨(927万公吨)。它具有可用的现代提升技术,包括4绳,5米直径,6500 kW的SIEMAG集成式电机Koepe提升机。其他改进和安全功能还包括具有连续监控功能的头部框架张力导索,多通道闭环制动控制电路以及用于超程保护的机械避雷器。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号