首页> 外文期刊>C4ISR: The journal of net-centric warfare >Battle ready - Ground station upgrade performs well in key test -- 6 years late
【24h】

Battle ready - Ground station upgrade performs well in key test -- 6 years late

机译:战斗准备就绪-地面站升级在关键测试中表现良好-推迟了6年

获取原文
获取原文并翻译 | 示例
           

摘要

This time, operators were sufficiently trained. This time, U.S. Air Force ISR analysts weren't interrupted in their work of deciphering airborne video, imagery and other intelligence for troops at war. This time, according to an Air Force official, the new operating system for analysts, called Distributed Common Ground System (DCGS) 10.2, showed the capability that had been promised when Raytheon and a group of subcontractors and the Air Force entered into a dollar500 million contract eight years ago.
机译:这次,对操作员进行了充分的培训。这次,美国空军的情监侦分析师在为战时部队解密机载视频,图像和其他情报的工作中并未受到干扰。根据空军官员的说法,这次用于分析师的新操作系统称为分布式通用地面系统(DCGS)10.2,显示了雷神公司和一组分包商以及空军投入5亿美元时所承诺的能力八年前签约。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号