首页> 外文期刊>EC&M >Ground testing on asphalt: how can you perform a ground test when you can't drive a spike?
【24h】

Ground testing on asphalt: how can you perform a ground test when you can't drive a spike?

机译:在沥青上进行地面测试:当您无法驾驶长钉时如何进行地面测试?

获取原文
获取原文并翻译 | 示例
       

摘要

A new customer has just awarded you a service contract to perform standard electrical maintenance for a large suburban mall. As part of the agreement, you must routinely test the pole grounds on parking lot lighting. But the site has acres of asphalt and concrete roadway or pavement, with little soil except what's around the potted shrubs. Many of the poles are so far from the fringes of open soil that you'd need prohibitively long test leads to reach a spot with access to the soil. Under the circumstances, you'd be unable to meet the critical placement requirements of the potential probe necessary to construct a fall-of-potential graph, but your contract calls for you to perform a full fall-of-potential test, as described in IEEE Standard 81, with the resultant graph included. What can you do?
机译:新客户刚刚授予您一份服务合同,为大型郊区购物中心执行标准的电气维护。作为协议的一部分,您必须例行测试停车场照明设备上的电线杆接地。但是该地点有数英亩的沥青和混凝土路面或人行道,除了盆栽灌木丛周围的土壤很少。许多电线杆都远离裸露的土壤边缘,因此您需要极长的测试导线才能接触到土壤。在这种情况下,您将无法满足构建电位下降图所需的电位探针的关键放置要求,但是您的合同要求您执行完整的电位下降测试,如IEEE标准81,其中包括结果图。你能做什么?

著录项

  • 来源
    《EC&M》 |2002年第1期|共2页
  • 作者

    Jeff Jowett;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 电工技术;
  • 关键词

  • 入库时间 2022-08-18 10:45:19

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号