首页> 外文期刊>Safety science >Task complexity as a performance shaping factor: A review and recommendations in Standardized Plant Analysis Risk-Human Reliability Analysis (SPAR-H) adaption
【24h】

Task complexity as a performance shaping factor: A review and recommendations in Standardized Plant Analysis Risk-Human Reliability Analysis (SPAR-H) adaption

机译:任务复杂性作为绩效影响因素:标准化工厂分析风险-人类可靠性分析(SPAR-H)的回顾和建议

获取原文
获取原文并翻译 | 示例
       

摘要

This review is part of the PetroHRA project that aims at adapting human reliability analysis to the petroleum industry. The different elements that make up complexity are reviewed through a thematic analysis which identified 83 complexity elements that were categorized into 13 complexity categories. Six of these were found to be relevant and were included in the "Task Complexity" performance shaping factor which is presented in this paper. The description of "Task Complexity" includes levels and multipliers. (C) 2015 Elsevier Ltd. All rights reserved.
机译:这项审查是PetroHRA项目的一部分,该项目旨在使人类可靠性分析适应石油行业。通过主题分析对构成复杂性的不同元素进行了审查,确定了83个复杂性元素,这些元素被归类为13个复杂性类别。其中六个被发现是相关的,并已包含在本文介绍的“任务复杂性”绩效塑造因素中。 “任务复杂性”的描述包括级别和乘数。 (C)2015 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号